Demolition and Rubble Removal at Shada

Lot 2 – Demolition and Rubble Removal at Shada, Awgha, Qala Mamorin, and Other
Villages within a 15 km Radius, Zindajan District, Herat Province, Afghanistan
Project Status: Ongoing
Brief Project Details:
The project involves the safe demolition of unstable structures and removal of rubble and
debris from earthquake-affected villages in Zindajan District. The works support early
recovery efforts, reduce health and safety risks, and enable future upgrading activities.
Implementation is carried out through a cash-for-work modality, providing short-term
employment opportunities for the affected local communities.

Construction of Sheen Ghazai Plum Concrete Surface Street

Construction of Sheen Ghazai Plum Concrete Surface Street (L = 800 m), Gozar #05,
District #3, Kandahar City
Completion Date: 28 October 2025
Brief Details:
Zurmat Group completed the construction of an 800-meter plum concrete street, including
base preparation and concrete surfacing. The project was delivered in accordance with
technical specifications and completed successfully within the agreed timeframe.

Construction of Qala Shahada Protection Walls

Construction of Qala Shahada Protection Walls (L = 480 m), Guzar #19, District 6,
Ghazni City – Lot 3
Completion Date: 31 August 2025
Brief Details:
The project involved the construction of 480 meters of protection walls to safeguard
residential areas. The works were substantially completed, inspected, and officially taken
over by the employer as per contract provisions.

Installation of Steel Stairs for Building

Installation of Steel Stairs for Building B – WFP Jalalabad Office
Completion Date: 22 August 2025
Brief Details:
The installation of external steel stairs for Building B was completed in line with WFP safety
and structural standards. The works were delivered on schedule and formally accepted by
the client for operational use.

Upgrading of Masjid Logariha Street

Upgrading of Masjid Logariha Street with Plum Concrete Surface (L = 595 m), Gozar
#07, District 18, Kabul City
Completion Date: 06 August 2025
Brief Details:
Zurmat Group successfully upgraded 595 meters of roadway with plum concrete, including
surface leveling and finishing works. The project was completed in accordance with
contractual timelines and was officially taken over by the employer.

Upgrading of Sari Tapa and Masjid Imam Abu Hanifa Streets

Upgrading of Sari Tapa and Masjid Imam Abu Hanifa Streets with Plum Concrete
Surface (L = 784 m), Gozar #6, District 8, Kabul City
Completion Date: 12 July 2025
Brief Details:
This project included upgrading two key urban streets with plum concrete surfacing over a
total length of 784 meters. The works were substantially completed and formally taken over
by the employer, improving road durability and traffic flow in the area.

Construction of Hazrat Osman Ghani Community

Construction of Hazrat Osman Ghani Community Center Boundary Wall (230 m),
District 15, Herat Province
Completion Date: 20 February 2024
Brief Details:
Zurmat Group completed the construction of a 230-meter boundary wall to secure the
community center. The works were carried out in line with structural and safety standards
and were formally completed and handed over to the employer without outstanding
defects.

Construction of 525 m Plum Concrete Road in Baharestan-e-Sehat

Construction of 525 m Plum Concrete Road in Baharestan-e-Sehat GA15, District 04,
Herat Province
Completion Date: 05 February 2024
Brief Details:
The project involved the construction of a 525-meter plum concrete road, including sub
base preparation and concrete surfacing. All works were executed in compliance with
approved designs and specifications and were successfully completed, as confirmed by the
issuance of the Final Completion Certificate.

Pavement of Parking Area (PCC)

Pavement of Parking Area (PCC) – WFP Jalalabad Office

Completion Date: 19 January 2025
Brief Details:
The parking area was successfully paved using plain cement concrete (PCC) in accordance
with WFP technical specifications. The works were completed to the required quality
standards, ensuring durability, proper drainage, and safe access for office operations. The
project was completed on time and accepted by the client.

Construction of Kozza Landi School

Construction of Kozza Landi School, Nazyan District, Nangarhar Province – Afghanistan
Completion Date: 26 March 2025
Brief Details:
The school construction project was successfully completed, providing durable educational
infrastructure for the local community. All structural and finishing works were finalized in
accordance with the contract requirements and accepted upon substantial completion.